{"id":201,"date":"2025-07-31T02:49:25","date_gmt":"2025-07-31T02:49:25","guid":{"rendered":"https:\/\/durgapurdiary.in\/wastewp\/?post_type=case_study&#038;p=201"},"modified":"2026-09-03T15:43:47","modified_gmt":"2026-09-03T15:43:47","slug":"minerva-house","status":"publish","type":"case_study","link":"https:\/\/durgapurdiary.in\/wastewp\/case-study\/minerva-house\/","title":{"rendered":"Minerva House Southbank, London"},"content":{"rendered":"<p>This project was unique as it involved the delivery and removal of waste using London\u2019s waterways. The bins were delivered to Plaistow Wharf, loaded onto a barge, and transported via the Thames to Minerva House at London Bridge. Upon arrival, the containers were lifted by crane onto the demolition site for waste loading. Once filled, the waste was transported back to our facility in Belvedere for recovery and recycling.<\/p>\n<p><strong>Key Achievements:<\/strong><\/p>\n<ul>\n<li>Successfully removed waste from a challenging demolition site in Central London.<\/li>\n<li>Minimised disruption to the surrounding area by reducing heavy road transport.<\/li>\n<li>Utilised London\u2019s waterways to lower carbon emissions and traffic congestion.<\/li>\n<li>Supported the client\u2019s sustainability goals by recovering and recycling waste at our facility.<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><strong>Project Success:<\/strong><\/p>\n<p>This collaboration with Morrisroe on the Minerva House project demonstrates our ability to provide tailored, environmentally conscious waste management solutions. By leveraging the Thames as a transport route, we were able to deliver exceptional results while reducing the project\u2019s environmental footprint. Our Waste by Water service is a clear example of how innovation and sustainability can work hand in hand to deliver successful outcomes.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-677\" src=\"https:\/\/durgapurdiary.in\/wastewp\/wp-content\/uploads\/2026\/07\/1752056825776-1-300x225.jpeg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/durgapurdiary.in\/wastewp\/wp-content\/uploads\/2026\/07\/1752056825776-1-300x225.jpeg 300w, https:\/\/durgapurdiary.in\/wastewp\/wp-content\/uploads\/2026\/07\/1752056825776-1-1024x767.jpeg 1024w, https:\/\/durgapurdiary.in\/wastewp\/wp-content\/uploads\/2026\/07\/1752056825776-1-768x575.jpeg 768w, https:\/\/durgapurdiary.in\/wastewp\/wp-content\/uploads\/2026\/07\/1752056825776-1-1536x1150.jpeg 1536w, https:\/\/durgapurdiary.in\/wastewp\/wp-content\/uploads\/2026\/07\/1752056825776-1.jpeg 1600w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/> <img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-676\" src=\"https:\/\/durgapurdiary.in\/wastewp\/wp-content\/uploads\/2026\/07\/1752056825327-1-300x225.jpeg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/durgapurdiary.in\/wastewp\/wp-content\/uploads\/2026\/07\/1752056825327-1-300x225.jpeg 300w, https:\/\/durgapurdiary.in\/wastewp\/wp-content\/uploads\/2026\/07\/1752056825327-1-1024x767.jpeg 1024w, https:\/\/durgapurdiary.in\/wastewp\/wp-content\/uploads\/2026\/07\/1752056825327-1-768x575.jpeg 768w, https:\/\/durgapurdiary.in\/wastewp\/wp-content\/uploads\/2026\/07\/1752056825327-1-1536x1150.jpeg 1536w, https:\/\/durgapurdiary.in\/wastewp\/wp-content\/uploads\/2026\/07\/1752056825327-1.jpeg 1600w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p class=\"elementor-blockquote__content\"><em>Our Minerva House project is a fantastic example of how partnerships between long term supply chains can work to provide effective and innovative solutions to demolition and construction projects in Central London. Morrisroes innovative use of the River Thames to clear materials from the project required Westminster Waste to provide tested materials skips, working with the barge supplier GPS Marine, we trialled multiple configurations, to help us maximise the efficiency of each trip and we welcomed their proactive approach in achieving a significant reduction of HGV lorries using the highways.<\/em><\/p>\n<h2 class=\"e-q-footer\"><cite class=\"elementor-blockquote__author\">Morrisroe<\/cite><\/h2>\n","protected":false},"featured_media":0,"menu_order":0,"template":"","class_list":["post-201","case_study","type-case_study","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/durgapurdiary.in\/wastewp\/wp-json\/wp\/v2\/case_study\/201","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/durgapurdiary.in\/wastewp\/wp-json\/wp\/v2\/case_study"}],"about":[{"href":"https:\/\/durgapurdiary.in\/wastewp\/wp-json\/wp\/v2\/types\/case_study"}],"wp:attachment":[{"href":"https:\/\/durgapurdiary.in\/wastewp\/wp-json\/wp\/v2\/media?parent=201"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}